Agriboard Install Complete / by Michael Cobb



The last Agriboard panels went up today.  Fitting these panels into the trapezoidal tower frame was the trickiest part of the Agriboard installation.  Since all the panels are installed in "keyways," the panels couldn't go in as a single panel and instead were put in as a group of three per face (see below).  The next step will be two-fold:  Installation of the lookout and the access stair.